Monday, November 10, 2008

Demolition 101.2

Apparently I was wrong - we weren't completely gutted last week. Now we are! The floor where the shower was is now removed and we have 3/4 inch pipe under it so that works perfect as we need that for the body sprays in the shower. He may try to move the pipes for the tub closer to the tub so we don't lose space on th floor. The shower will be 4' long and then if he can't move the pipes for the tub, the linen closet will be 16". If you look closely, you can see the marks on the floor.

Tom did that today as well as marked up walls for lights, mirrors, and linen closet. He will bring in drywall on Friday.

No comments: