Monday, November 24, 2008

Patience

I was so hoping to get some tile laid today, but today was just prep work. Apparently it will start tomorrow. So, I can at least show you what it looks like today, as well as the faucet that Andy helped us buy for our birthdays. (He wanted to see a picture, so even though it is not in yet, at least he gets a pretty good idea.)

This is the plan for the shower and tub. The smaller tiles are the glass tile.

This is the plan for the floor. In the shower, the smaller tile is the pebbles.
The cement board is laid and the pebbles for the shower are on the floor.

The mud base is set for the base of the shower. This is what the pebbles will go on.

This is as good as I could get a picture of the tile that goes on the floor as well as in the shower and the tub surround.
And, just for Andy, this is a picture of the faucets in Oil rubbed bronze.

No comments: